Paint Remedial Scheme - Supervision & Quality Assurance

Date June – September 2018
Services Supervision & Quality Assurance to Paint Remedial Scheme of Bridges & Gantries.

Over a 4 month period in mid 2018, SIS Ltd were tasked with providing independent supervision and quality assurance checks of a paint remedial scheme to several bridges and gantries for the M6 Toll Midland Expressway.

All stages of the preparation and application of the 3 coat system were observed by a SIS paint coating inspector with dry film and wet film coating readings obtained at each application stage to ensure satisfactory coverage was met to the desired standard and satisfaction of the client.

On completion of each shift attended, an overview report was compiled for each structure attended to, detailing all aspects of the shift and the works undertaken including temperatures, dew points and paint thickness readings obtained to various elements of each structure. Any non compliant and health and safety aspects were also detailed as well as being reported directly to the client at the time.

Related projects